Why it matters
Every house we walk into with a Wi-Fi problem has the same root cause: nobody ran cable where it was needed. A drop costs almost nothing before drywall. After, it's a fishing job, a patch, and a painter.
Worth having the conversation while the framing is open and a change is a pencil mark instead of a change order.
Cable, fiber and camera runs placed to the plan while the framing is open, with the home-run location picked before it becomes whatever closet is left.
Fishing through finished walls where it can be done cleanly, and an honest answer about where it can't before anybody opens drywall.
Send prints and we'll come back with drop counts and a number, not a vague range that moves once work starts.
Jacks, plates, panel and rack terminated and dressed. Both ends labeled so the bedroom jack matches the port in the closet.
Every run tested end to end with the results written down and handed over, so a punch-list item doesn't turn into an argument.
Low-voltage goes in around the other trades, not through them. We show up when the schedule says and keep the site clean.
What the client gets
A written record of what went in, where each cable runs, and the test results. Your handoff looks professional, and the homeowner calls us in three years instead of calling you.
Send the plans or the address and the rough timeline. We'll tell you what the low-voltage scope should be and what it runs.